Relationship Between Plant Layout and Material Handling
Plant Layout (the physical arrangement of departments, workstations, equipment, and storage areas within a facility) and Material Handling (the system for moving materials between these locations) are fundamentally intertwined. They are two sides of the same coin when it comes to designing efficient operations. Optimizing one requires careful consideration of the other.
Key Aspects of the Relationship:
-
Layout Dictates Handling Requirements: The layout directly determines:
- Distances: How far materials need to travel between operations or storage points.
- Paths: The routes materials must take (straight, convoluted, congested).
- Frequency: How often moves are required between specific locations.
- A poor layout inherently creates inefficient MH needs (long distances, backtracking).
- MH Cost Minimization is a Layout Goal: A primary objective of good plant layout design (e.g., using Systematic Layout Planning - SLP) is to arrange facilities to minimize the distance, time, and cost associated with material handling. Departments with high inter-departmental flow are typically placed close together.
-
Handling Equipment Influences Layout Design: The type of MH system chosen impacts layout possibilities:
- Fixed Path Equipment (Conveyors): Often requires a linear or highly structured layout (typical of Product Layouts) to accommodate the fixed route.
- Variable Path Equipment (Forklifts, AGVs): Allows for more layout flexibility (suitable for Process Layouts) but requires careful planning of aisle widths, turning radii, and clear pathways.
- Overhead Equipment (Cranes): Needs specific structural support, adequate ceiling height, and clear operating zones below, influencing building design and floor layout.
-
Layout Enables MH System Effectiveness: A well-designed layout provides the necessary infrastructure for the chosen MH system to operate efficiently:
- Adequate aisle space for equipment movement.
- Strategically located storage points (Point-of-Use Storage - POUS).
- Clear loading/unloading areas.
- Minimized congestion points.
- Integrated Design Approach: Layout and MH system design should be done concurrently, not sequentially. Decisions about one directly impact the optimal choices for the other. Considering them together leads to a synergistic effect, resulting in lower costs, faster throughput, and improved safety.
- Indian Example: When Larsen & Toubro (L&T) designs a heavy engineering workshop for manufacturing large industrial equipment, the layout must accommodate the movement of massive components. This necessitates wide aisles, high ceilings, strong floors, and the integration of high-capacity overhead cranes (MH Equipment). The placement of large machinery (e.g., boring machines, welding stations) is determined not just by process sequence but also by crane access and the flow path required for handling the heavy workpieces. The layout is designed around the needs of the critical material handling system.
Ignoring the intimate relationship between layout and material handling inevitably leads to suboptimal performance, higher costs, and potential safety hazards. Effective operations management requires an integrated perspective on both.